New Buildings (NB)
Alteration Type 1
Alteration Type 2
Alteration Type 3
Demolition (Full Demolition& Partial Demolition)
Sign Permit
Hanged scaffold/ Outrigger (CD5)
Subdivision
Place of Assembly (PA)
Temporary Place of Assembly (TPA)
Letter of No Objection
Sewer Connection/ Site Connection (SD1&2)
Cross Connection (RPZ)
Spray Booth (Industrial Processes)
Sidewalk and Roadway Permit
Con Ed Vault Permit
Fire Suppression System (SBS)
Fire Alarm
Sidewalk Café Permit
Landmark Permit
Certificate of No Effect